Compare Listings

New Air Rail Lines in Istanbul

New Air Rail Lines in Istanbul

Turkey Government is planning 10 new Air Rail lines in Istanbul. The distance of new lines will be 86.7 km in total. The purpose is to reduce the traffic problem in Istanbul.

New Air Rail Lines with starting to activity dates as follows;

Sefaköy-Halkalı-Başakşehir Air Rail Line;

It will be total 15 KM with 17 stations and will start to activity in 2019.

Stations

  • Sefaköy
  • Fevzi Çakmak
  • TevfikBey
  • Sanayi
  • Gümrük Yolu
  • Halkalı Merkez
  • Toki 1
  • Toki 2
  • Atakent
  • Masko
  • Ziya Gökalp
  • Atatürk Oto Sanayi 1
  • Atatürk Oto Sanayi 2
  • 1. Etap Başakşehir Konutları
  • Onurkent
  • Oyakkent
  • Fatih Terim Stadyumu

Sefaköy-Kuyumcukent-Havalimanı Air Rail Line;

It will be total 7 KM with 3 stations and will start to activity after 2019. The distance between first and third station will be just 14 minutes.

4. Levent-Gültepe-Çeliktepe-Levent Air Rail Line:

It will be total 5.5 km with 4 stations and will start to activity after 2019. The distance between first and fourth station will be only 11 minutes.

Beyoğlu-Şişli Air Rail Line:

It will be total 5.8 KM with 8 stations and will start to activity after 2019. The distance between first and eighth station will be only 12 minutes

Stations

  • Şişhane
  • Kulaksız
  • Kaptanpaşa
  • Fetihtepe
  • Talatpaşa
  • Gürsel
  • Çağlayan
  • Mecidiyeköy

Maltepe-Başıbüyük Air Rail Line:

It will be total 9 KM with 8 stations and will start to activity after 2019. The distance between first and eighth station will be only 18 minutes

Stations

  • Sahil
  • İdealtepe
  • Altayçeşme
  • Aydınlık Evler
  • Başıbüyük
  • İnönü
  • Toplu Konut
  • Girne

Kadıköy-Üsküdar (Libadiye Street) Air Rail Line:

It will be total 7.4 KM with 9 stations and will start to activity after 2019. The distance between first and eighth station will be only 12,5 minutes

Stations

  • Hasanpaşa
  • Ziverbey
  • Göztepe SGK Hospital
  • Göztepe SGK Policlinics
  • Göztepe Kavşağı
  • Soyak
  • Fetih Mahallesi
  • DSİ
  • Libadiye

Tuzla Belediyesi-Sahil Air Rail Line:

It will be total 4.7 KM with 6 stations and will start to activity after 2019. The distance between first and eighth station will be only 9.5 minutes

Stations

  • Tuzla Belediyesi
  • Evliya Çelebi
  • Şinasi Duralı
  • Dörtyol
  • Vatan
  • Marina

Kartal-D-100 Air Rail Line:

It will be total 3 KM with 5 stations and will start to activity after 2019. The distance between first and fifth will be only 6 minutes

Stations

  • Gümüşpınar
  • Kartal
  • Yunus
  • Karlıtepe
  • Kordonboyu

Ataşehir -Ümraniye Air Rail Line:

It will be total 11 KM and they are planning to start construction after planning the distance between stations will reduce 22 minutes.

Kadıköy-Maltepe-Kartal Air Rail Line:

It will be 18 KM and will start to activity after 2019. The distance between stations will reduce 36 minutes.

img

admin

Related posts

Eid al-Fitr holiday in Turkey

The Turkish Presidency announced that Eid al-Fitr holiday starts from June 1 until the 9th of the...

Continue reading
by admin
  • News

New Decision Allows the Palestinian to Own Property in Turkey

The Department of Foreign Affairs of the Tabu Directorate issued a new decision allowing the...

Continue reading
by admin
  • News

The most expensive and cheapest areas in Istanbul

following is a study for the prices of the most expensive and lowest priced apartments per square...

Continue reading
by admin

Join The Discussion

تواصل معنا مباشرة على الواتس اب
Contact us directly on WhatsApp
Powered by
Contact Us

We are glad that you preferred to contact us. Please fill our short form and one of our friendly team members will contact you back.






X
CONTACT US